Description
435W PV Key Features:
- SMBB Cell Design: Super multi Busbar cells bring lower resistance, and increased Busbar reflectance ensures higher power output,
- Low degradation: Adopt N-Type TOPCon cell technology, which lowers degradation, improves temperature co-efficiency, and significantly increases generation performance.
- High Reliability: Strict in-house testing in PV Lab is CNAS-approved & TUV/VDE certified.
- Excellent Low-Light Performance: Advanced solar cell and glass surface texturing technology provides exceptional performance in low-light environments.
- PID Resistant: Excellent PID resistance performance optimised by unique structural design.
This product must be installed by a registered electrician with a parallel generation/solar endorsement (from September 1st 2025) who can issue a Certificate of Compliance and Electrical Safety Certificate for completed work. AA Solar can provide this comprehensive service. Alternatively, we can work with your chosen providing them with the products' Supplier Declaration of Compliance (SDoC) and the supporting documentation they need.
This excludes mobile, motorhome, and marine installs that do not require 230V AC componentry.
Specification
SEANZ Authorised Installers
As an authorised SEANZ Parts Supplier and Installer, we require all solar parts covered by AS/NZS Standards 4509, 4777, 5033 and 5139. (This excludes mobile or motorhomes and marine kitsets/products that do not require 230V AC componentry), to be sent to a SEANZ-authorised installer, registered electrician, or professional installer with parallel generation/solar endorsement (from September 1st, 2025) to ensure all safety standards are met and to remove all potential risks and dangers for the end consumer.
Please call us on 09 887 9767 to discuss the legal requirements for system design, installations, and commissioning. This includes the Supplier Declaration of Compliance (SDoC), Certificate of Compliance (CoC), Electrical Safety Certificate (ESC), Record of Inspection (ROI), Distributed Generation Application (DG Application) under the EDB network (Electrical Distribution Business), and the electricity retailer's approval.
Key Requirements:
- The installer must provide a Certificate of Compliance (CoC) for the work they completed to ensure the installation is compliant with 5033, 4777, and 4509. (where applicable and within 20 working days)
- An independent inspector must inspect the installation and complete the Record of Inspection. (ROI). Within 20 working days
- The installing electrician or inspector must also sign an Electrical Safety Certificate (ESC) before final connection to the network.
- The registered electrician signing off the COC and or ESC must have a mains parallel generator endorsement on their practising licence (from September 1st 2025)
- It is the inspector's responsibility to enter the ROI on the High-Risk database within 20 working days of issuing the ROI.
We can arrange everything for you or work with your chosen qualified solar installer.